Image
Visualization of Lakeland Tennessee Hwy 70 Roundabout
Image
Visualization of Seedtick Lakeland Tennessee Hwy 70 4 way intersection
Image
Village Market Hwy 70 Visualization
Image
Representative standing in front of a table at a vision workshop

City of Lakeland – Highway 70 Corridor Study

Client

City of Lakeland

Location

Lakeland, Tennessee

Visualizing a New Future for Highway 70

The city of Lakeland, Tennessee had a clear priority for Highway 70: make it safer. The three-mile corridor is a four-lane, undivided state route characterized by high traffic volume, straight alignment and rolling terrain that contribute to limited sight distance at intersections, speeding, and other safety concerns. 

The city engaged OHM Advisors to conduct a study of the corridor and evaluate potential improvements that would accommodate future growth while balancing the mobility needs of all users. 

From the outset, the study was shaped by traffic, crash and land-use analysis, as well as input from local developers, residents and TDOT, who advised the team about state highway requirements. A GIS-based online survey gathered feedback early in the process, with safety emerging as residents’ top priority and trails and bike paths among the most requested improvements. 

OHM translated those findings into two design concepts and built a comprehensive traffic model to test both options against existing and projected traffic volumes. The analysis ultimately led to a recommended design that includes four roundabouts, two signal upgrades, a 14-foot multi-use path running the length of the corridor and a greenway connection beneath Highway 70.

 To help residents understand how the proposed changes would look and function along a familiar highway, OHM created a fly-through video combining high-definition drone footage with conceptual models of proposed improvements within the corridor. The visualization brought the plan to life and added details such as pavement patterns, vehicles, pedestrians, mature trees, lighting and landscaping to help residents picture the corridor in context. 

The City debuted the video at a Community Visioning Workshop and also shared it through a follow-up online survey, giving residents another opportunity to respond to the proposed design.

The resulting study gave Lakeland a phased roadmap for Highway 70 and has already been used to support Safe Streets and Roads for All grant applications for two intersections.

View the Highway 70 corridor study and watch the fly-through video!

Project Highlights: Public Engagement, 3D Visualization, Drone Videography, GIS-Based Surveys, Transportation Planning

Featured Team Members

James Robert Dearman Colored Headshot
James Robert Dearman
Client Representative
Anas Alrejjal, Color
Anas Alrejjal
Project Manager

Awards & Recognition

2026 APWA Tennessee Mark Miller Public Works Project of the Year Award

APWA's Project of the Year recognizes public works projects that demonstrate excellence in the field of engineering.